|
Moving in the Main Tank

Rollers were put under the metal stand and the tank was carefully slid onto the stand
from the truck parked in our garage.

Then the tank and stand were rolled around the trench dug for the pipes that will connect the sump to the frag tank.

Next the stand was jacked up on each side to take the rollers out. (This was easier said than done!)

Lastly, ten guys adjusted the stand and tank in place by pushing it inches at a time.
Thanks guys! Now we wait for the custom sump, frag tank, and
equipment to come in. Stay tuned!
|